EN 

CCUS APPLICATIONS

Carbon Capture,
Utilization & Storage
Solutions

SUTONG provides tower internals and mass-transfer solutions for CO2 absorption, regeneration, scrubbing, and mist elimination across new-build and retrofit projects.

Carbon capture tower with mass-transfer internals
CAPTURE PROCESS

Integrated Mass Transfer for
Absorption and Regeneration

From absorption to solvent regeneration and gas treatment, each process section requires a tailored internals configuration.

  • CO2 Absorption

    Structured packing and liquid distribution support consistent contact between flue gas and solvent.

  • Solvent Regeneration

    Tower internals support the mass-transfer duty required to release captured CO2 and return solvent to circulation.

  • Water-Wash & Amine Recovery

    Wash-section internals support gas-liquid contact for cooling, solvent recovery and control of vapor-phase amine downstream of the absorber.

  • Droplet & Mist Control

    Wire-mesh and vane-type devices help control entrained droplets before the treated gas leaves the capture system.

CORE COMPONENTS

Core Internals for
Carbon-Capture Towers

Each project starts with its operating case, tower geometry and required separation duty.

  • Structured packing for carbon-capture towers

    Structured Packing

    Supports gas-liquid contact in absorption, regeneration and washing service.

  • Wire-mesh demister for entrained liquid removal

    Wire-Mesh Demisters

    Used for efficient removal of entrained liquid droplets where high collection efficiency and low pressure drop are required.

  • Liquid distributor for a packed column

    Liquid Distributors

    Distribute liquid across the packing bed according to tower diameter and operating load.

  • Vane mist eliminator with drainage channels

    Vane Mist Eliminators

    Selected for higher liquid loading, fouling-sensitive services or duties requiring robust drainage and operating flexibility.

ENGINEERING PRIORITIES

Balance Mass Transfer,
Pressure Drop and
Entrainment Control

CCUS tower internals need to work as one arrangement rather than as isolated components.

  • 01

    Effective Contact

    Match packing and distribution to the absorption or regeneration duty.

  • 02

    Hydraulic Fit

    Review gas and liquid loads against tower diameter, available space and pressure-drop targets.

  • 03

    Carryover Control

    Select mist elimination around droplet loading, solvent service and downstream requirements.

Industrial process columns for new-build and retrofit projects
PROJECT FIT

A Practical Path for
New-Build and Retrofit
Internals Projects

Align the internal arrangement with the tower you are designing or the shell you need to keep.

  • New-Build Projects

    Coordinate the internal arrangement with tower dimensions, process loads and maintenance access.

  • Retrofit Projects

    Work within the existing shell, support locations, available height and installation constraints.

PROJECT WORKFLOW

From Process Conditions
to an Internal Arrangement

Four project discussions turn the design basis into a coordinated internal configuration.

  1. Step 01

    Share the
    Design Basis

    Process duty, operating data, solvent and tower geometry.

  2. Step 02

    Review the
    Constraints

    Pressure drop, distribution, entrainment, materials and available space.

  3. Step 03

    Develop the
    Configuration

    Align packing, distributors and mist eliminators with the duty.

  4. Step 04

    Confirm Project
    Interfaces

    Review dimensions, materials, installation needs and documentation.

Discuss Your Next
Carbon-Capture Project

Whether you are developing a new unit or improving an existing one, discuss your capture duty with our team to identify opportunities in efficiency, pressure drop and solvent management.

Packing and tower internal installation detail
CCUS FAQ

Frequently Asked Questions

Start with the process data, tower constraints and separation duty that shape the discussion.

  • What information is needed to discuss a CCUS tower application?

    Share the process duty, gas and liquid operating data, solvent, tower dimensions and the main performance constraints.

  • Selection depends on droplet loading, gas and liquid flow rates, solvent service, pressure-drop targets and available space. Wire-mesh and vane-type devices are reviewed against these operating requirements.

  • Product selection starts with the operating case, tower geometry and required separation duty. Review the process data and project constraints before confirming a suitable internal arrangement.

  • Yes. New-build projects coordinate tower dimensions, process loads and maintenance access. Retrofit projects also account for the existing shell, support locations, available height and installation constraints.

  • Wash-section internals support solvent recovery and control of vapor-phase amine. Suitable mist eliminators help remove entrained liquid droplets. The arrangement is reviewed against solvent service and downstream requirements.